Making Progress: Sunroom, Garage, and Wood Shop

This hybrid stick frame/post and beam addition is well underway now. The post and beam frame is complete and features a tongue-in-groove cathedral ceiling with S.I.P.S. panel and cold roof construction. The images of the roof show the strapping, which allows for venting to regulate temperature differentials and prevent moisture damage to the shingles. Sheathing is up a large portion of the entire structure. The stick frame garage and sun room have a hot roof construction which utilizes closed-cell foam to insulate the roof from temperature differentials. The garage floor is also underway, the various phases of construction visible at the time of these photos.